Philippine EIS System
ECC Application and Environmental Impact Assessment in the Philippines
EnviSynergy prepares the environmental impact assessment documents required to secure an Environmental Compliance Certificate (ECC) from the DENR Environmental Management Bureau, from project screening through ECC issuance and post-ECC compliance.
Request a ConsultationWhat Is an ECC?
An Environmental Compliance Certificate (ECC) is the document issued by the DENR Environmental Management Bureau (EMB) that certifies a proposed project will not cause significant negative environmental impact, based on the proponent's environmental impact assessment and commitments. The requirement arises from Presidential Decree No. 1586, which established the Philippine Environmental Impact Statement System (PEISS), and is implemented through DENR Administrative Order No. 2003-30 and its Revised Procedural Manual.
Projects classified as Environmentally Critical Projects (ECPs), and projects located in Environmentally Critical Areas (ECAs), are covered by the PEISS. The type of document required depends on the project category, scale, and location. Projects outside the coverage of the system may instead secure a Certificate of Non-Coverage (CNC).
As a DENR-EMB registered EIS preparer (CFCO-0045), EnviSynergy determines the correct coverage and document type at the outset, which reduces the risk of returned applications and review delays.
ECC and EIA Services
Project Screening and Coverage Determination
Classification of the project under the PEISS and identification of the required document before any fieldwork begins.
- ECP and ECA screening
- Project category and threshold review
- CNC eligibility assessment
Environmental Impact Statement (EIS)
Full EIS preparation for Environmentally Critical Projects, including baseline characterization, impact assessment, and the Environmental Management and Monitoring Plan.
- Terrestrial, aquatic, air, water, and socioeconomic baseline studies
- Public scoping and consultation support
- Environmental Management Plan and Environmental Monitoring Plan
IEE Checklist and Initial Environmental Examination
Preparation of Initial Environmental Examination reports and IEE Checklists for projects that do not require a full EIS.
- Document type confirmation
- Site-specific impact assessment
- Mitigation and monitoring commitments
EPRMP and PEPRMP
Environmental Performance Report and Management Plans for operating projects without an ECC, and for expansions or modifications of existing projects.
- Operating facility assessment
- Expansion and modification applications
- Programmatic submissions for multiple facilities
ECC Amendments and CNC Requests
Applications to amend ECC conditions or project descriptions, and Certificate of Non-Coverage requests for projects outside PEISS coverage.
- Minor and major ECC amendments
- Change of project description or ownership
- CNC documentation
Post-ECC Compliance
Support after issuance so that ECC conditions are implemented, monitored, and reported.
- ECC Compliance Monitoring Reports (CMR)
- Multipartite Monitoring Team (MMT) support
- Environmental Guarantee Fund and monitoring fund arrangements where required
Legal Basis
| Issuance | Relevance |
|---|---|
| PD 1586 | Establishes the Philippine Environmental Impact Statement System and the ECC requirement. |
| Proclamation No. 2146 | Proclaims the categories of Environmentally Critical Projects and Environmentally Critical Areas. |
| DAO 2003-30 | Implementing Rules and Regulations of the PEISS, applied through the Revised Procedural Manual. |
Full texts and recent issuances are available in the DENR Policies database.
How the ECC Process Works
- 1
Screening
The project is classified under the PEISS to determine whether an EIS, IEE Checklist, EPRMP, or CNC applies.
- 2
Scoping
For EIS-based applications, the scope of the assessment is agreed with EMB and the review team, with stakeholder participation.
- 3
Baseline Studies and Impact Assessment
Field surveys and analysis establish existing conditions and predict impacts across the land, water, air, and people modules.
- 4
Document Preparation and Submission
The EIA report and supporting documents are prepared and filed with the appropriate EMB office.
- 5
Review and Decision
EMB reviews the application, which may include technical review and requests for additional information, before issuing a decision.
- 6
Compliance Monitoring
After issuance, the proponent implements the ECC conditions and submits the required monitoring reports.
Frequently Asked Questions
Related Guides
Start Your ECC Application
EnviSynergy Corporation is a DENR-EMB registered EIS preparer (CFCO-0045) serving project proponents and establishments across the Philippines.