Philippine EIS System · PD 1586 · EMB MC 2014-005

EIA Coverage Screener

Describe your project to see its likely category under the Philippine EIS System, the EIA document to prepare, the EMB office to file with, and whether it leads to an Environmental Compliance Certificate (ECC) or a Certificate of Non-Coverage (CNC).

  1. 1Your details
  2. 2Industry
  3. 3Proponent and location
  4. 4Project components
  5. 5Screening result

Before you start

Tell us where to send your screening report.

Your screening report will be sent to the email address above. The email includes a brief introduction to EnviSynergy, our services, our contact number and email address, and your screening report.

Basis. Thresholds follow the Annex A matrix of EMB Memorandum Circular 2014-005 (Revised Guidelines for Coverage Screening and Standardized Requirements under the Philippine EIS System), with documents and offices from its Table 2. Project-specific rules follow DAO 2025-20 and DAO 2025-30 (floating solar), DAO 2023-08 (Laguna Lake floating solar), DAO 2026-09 (offshore wind), DAO 2025-25 (climate and disaster risk assessment), DAO 2025-36 and DAO 2026-23 (Boracay Island), DAO 2026-03 (reclaimed areas), and DAO 2026-22 (multipartite monitoring).

Limits. This tool gives an indicative pre-screening only and does not replace the screening decision of the DENR Environmental Management Bureau. Project types not listed in Annex A are screened by EMB against the most similar type; choose "Other / unlisted project type" for those. Results near a threshold boundary should be confirmed with EMB.