DENR-EMB Permitting
DENR Environmental Permits and Registrations in the Philippines
EnviSynergy prepares, files, and follows through DENR Environmental Management Bureau permit applications so that facilities can operate lawfully and avoid notices of violation.
Request a ConsultationWhich DENR Permits Does a Facility Need?
Most establishments in the Philippines hold several environmental permits at once. The ECC or CNC covers the project itself. Separate permits then regulate air emissions under the Philippine Clean Air Act (RA 8749), wastewater discharges under the Philippine Clean Water Act (RA 9275), and hazardous waste under RA 6969. Most establishments must also designate an accredited Pollution Control Officer.
Air and water permit applications are generally processed through the EMB Online Permitting and Monitoring System. Facilities within the Laguna de Bay Region are additionally subject to the permitting requirements of the Laguna Lake Development Authority (LLDA).
EnviSynergy maps every permit a facility needs, prepares the technical requirements, and tracks validity periods so that renewals are filed on time.
Permits and Registrations We Handle
Permit to Operate (Air Pollution Source Installations)
Permits under RA 8749 for generator sets, boilers, furnaces, and other air pollution source and control installations.
- Inventory of air pollution source equipment
- Engineering and technical documentation
- Coordination of source emission testing with accredited firms
- Renewal tracking
Wastewater Discharge Permit
Permits under RA 9275 for establishments discharging wastewater to receiving bodies of water or land.
- Wastewater characterization and treatment review
- Effluent compliance evaluation against DAO 2016-08 and DAO 2021-19
- LLDA requirements for the Laguna de Bay Region
Hazardous Waste Generator Registration
Registration and related requirements under RA 6969 and DAO 2013-22 for establishments that generate hazardous waste.
- Waste stream identification and classification
- Generator registration
- Manifest and transport, treatment, and disposal coordination requirements
Pollution Control Officer Accreditation
Support for the designation and accreditation of Pollution Control Officers under DAO 2014-02, as amended by DAO 2018-07.
- PCO designation requirements
- Accreditation application
- Outsourced PCO assistance
ECC and Certificate of Non-Coverage
Environmental impact assessment and ECC applications, or CNC requests for projects outside the Philippine EIS System.
- Coverage screening
- EIS, IEE Checklist, and EPRMP preparation
- ECC amendments
Permit Portfolio Management
A single register of every permit, condition, and expiry date across one or more facilities.
- Permit and condition register
- Renewal calendar
- Response to Notices of Violation
Legal Basis
| Issuance | Relevance |
|---|---|
| RA 8749 | Philippine Clean Air Act of 1999. Basis of the Permit to Operate for air pollution source installations. |
| DAO 2000-81 | Implementing Rules and Regulations of RA 8749, including emission standards for stationary sources. |
| RA 9275 | Philippine Clean Water Act of 2004. Basis of the Wastewater Discharge Permit. |
| DAO 2005-10 | Implementing Rules and Regulations of RA 9275. |
| RA 6969 | Toxic Substances and Hazardous and Nuclear Wastes Control Act of 1990. |
| DAO 2013-22 | Revised procedures and standards for the management of hazardous wastes. |
| DAO 2014-02 | Revised guidelines for Pollution Control Officer accreditation, amended by DAO 2018-07. |
| PD 1586 | Philippine Environmental Impact Statement System and the ECC requirement. |
Full texts and recent issuances are available in the DENR Policies database.
How We Work
- 1
Permit Mapping
We review the facility, its equipment, and its waste streams to identify every permit and registration that applies.
- 2
Gap Review
Existing permits are checked for validity, conditions, and consistency with current operations.
- 3
Technical Preparation
Engineering documents, inventories, and testing results are compiled to meet EMB requirements.
- 4
Filing and Follow-Through
Applications are filed with the appropriate EMB Regional Office or LLDA and followed through to issuance.
- 5
Renewal and Compliance
Validity periods and permit conditions are tracked so that renewals and reports are submitted on time.
Frequently Asked Questions
Related Guides
- What Environmental Permits Does Your Business Need? A Guide to DENR Requirements
- Permit to Operate (PTO) in the Philippines: Complete Guide and FAQ
- Pollution Control Officer (PCO) in the Philippines: Training, Accreditation, and Compliance Guide
- Environmental Requirements for Renewable Energy Projects in the Philippines
Secure Your DENR Permits
EnviSynergy Corporation is a DENR-EMB registered EIS preparer (CFCO-0045) serving project proponents and establishments across the Philippines.
Request a Consultation